Agile’s Watergate

A relic of the Waterfall model is the construct of a “gate” process. In order for a project to achieve a milestone, the project/solution would need to achieve certain criteria that would allow it to go to the next phase of the project. For example, going from solidifying requirements in a Business Requirements Doc (BRD) to the software implementation phase.

In Agile, we leverage the Product Owner (PO) and the Product Backlog to determine what gets done and when. A Product Backlog item (PBI) may cover the full lifecycle of a Feature, from requirements to implementation. The Product Owner dictates acceptance of the PBI based on the status/transparency of the Backlog, such as the criticality of the Bugs linked to the PBI. Product quality and implemented functionality are transparent to the PO, who will determine the next steps such as release the software, and/or go through another iteration/sprint. Iterations are a defined cadence agreed to by the implementation team and the Product owner, typically, 2-week sprints.

Agile, Hybrid Environments: Opportunities for Synergy

Epics, Features, Product Backlog Items, and Tasks are object types in a Backlog that enable the PO and the team to link objects and plan over multiple sprints. Epics or Themes of Sprints are “high level”, potentially strategic initiatives. Features roll up into Epics as a part of several sprints. Either Epics or Features may be high enough level to link to Psydo Project Milestones for a product roadmap of deliverables, and solicitation outside the team.

Aggregation of Product Backlog Items, Effort Estimations, roll up into Features, and then up into Epics, which roughly equate to milestone timelines.

The “Definition of Done” (DoD) for a Product Backlog Item may require 0 outstanding Bugs with the severity of “Critical” linked to this PBI. The DoD criteria could be analogous to a traditional Quality Assurance gate.

Tasks that are production rollout activities, without a project plan, should be planned for in future sprints, akin to estimating when items may be completed in the proper sequence. Some of the Tasks may be placed conservatively in “early” sprints and may require items to be “pushed forward” after each of the iterations.